XP 22 Ounce 1 Piece STEEL HAMMER being used on nail.
Featured Articles

New Technology Added To Xp Line Of Hammers

MORE ARTICLES

  • 6 INCH CORDLESS GRINDER WITH KICKBACK BRAKE in action
    Blog

    Manufacturers’ Pivotal Role in Safety: Innovation to Put Users in Control

    Products with built-in, innovative safety features need to be ubiquitous for the construction industry to effectively improve safety across the board.

  • Top 5 Factors for Choosing the Right Tool & Asset Management Software
    Blog

    Top 5 Factors for Choosing the Right Tool & Asset Management Software

    Beyond essential tool tracking, a modern inventory management solution like Site Manager can offer analytical insights, automate inventory activities, and prevent costly delays. However, with numerous options available, selecting the right inventory management software requires careful consideration. Here are key factors to keep in mind.

  • DEWALT Concrete Sensor
    Blog

    4 Tips for Optimizing Concrete Curing with Wireless Sensors

    Concrete wireless sensor technology represents a groundbreaking advancement in the construction industry, offering unparalleled insights into the behavior and performance of concrete structures. These innovative sensors are designed to monitor critical parameters such as temperature, strain, and vibration in real-time, providing invaluable data throughout the concrete's curing and hardening process.

  • Dewalt Sensor Hub
    Blog

    Concrete is on the Brink of a Technological Revolution

    Concrete is on the Brink of a Tech Revolution

  • DEWALT Cable Tray Cutter is used by a kneeling tradesman to cut basket tray in a data center.
    Blog

    Charting the Prefabrication Journey

    For companies ready to make a jump into off-site fabrication and Building Information Modeling (BIM), it may be helpful to understand what’s ahead in your journey: How many FTEs (full-time equivalents) will be required? What principal challenges will you face at each phase of your journey? What level of investment will be required? How much of your work will be prefabbed, at first and ultimately?